Final | 8/26/2015 | 8/26/2015 | 8/26/2015 | P | PASS |
Eric Story
|
|
|
The later the better. Thank you Phone #: ###-#### Inspection requested via web by Eric Brown final ok
|
Conference | 8/19/2015 | 8/19/2015 | 8/19/2015 | P | DONE |
Eric Story
|
|
|
Question on receptacle requirements for a sitting island with cabinet doors. At end of day would be perfect but at your convienence. Thank you Phone #: ###-#### Inspection requested via web by Eric Brown discussed location of receptacle for penisula the only location without damage was on both sides within 20in of edge i agreed on the install
|
Electrical Rough-In | 2/20/2015 | 2/20/2015 | 2/20/2015 | A | PASS |
Cevyn Recla
|
|
|
Floor heat inspection in the laundry room. Thank You Phone #: ###-#### Inspection requested via web by Eric Brown Floor heat, laundry room ok to cover
|
Electrical Rough-In | 1/28/2015 | 1/29/2015 | 1/28/2015 | A | PASS |
Cevyn Recla
|
|
|
Phone #: ###-#### Inspection requested via web by Eric Brown RI Ok to cover upstairs and cantilever decks
|
Permanent Service | 1/22/2015 | 1/22/2015 | 1/22/2015 | A | PASS |
Cevyn Recla
|
|
|
New 200 amp overhead service. Phone #: ###-#### Inspection requested via web by Eric Brown PS, OH, N, OK
|