Final | 4/21/2015 | 4/22/2015 | 4/22/2015 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Barbara Szurgot Final ok
|
Final | 2/18/2015 | 2/19/2015 | 2/19/2015 | P | PART |
Rock A. Hudson
|
|
|
This final is for temporary occupancy. There are some pieces of equipment that are not on site yet. Please call Steve with any questions. ###-####. Phone #: ###-#### Inspection requested via web by Barbara Szurgot 314.20- Receptacle outlet in office box recessed in wall over 1/2", extension ring required. 400.8(2)- Flexible cords were installed for TV power. Had all cords removed. Receptacle locations will have to be moved for TV cords to reach. Temp final ok
|
Electrical Rough-In | 2/12/2015 | 2/13/2015 | 2/13/2015 | P | PASS |
Rock A. Hudson
|
|
|
Ceiling inspection. Steve will be on job site. Phone #: ###-#### Inspection requested via web by Barbara Szurgot Grid rough in ok cover
|
Rough-In Permanent Service | 2/10/2015 | 2/11/2015 | 2/11/2015 | A | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### Inspection requested via web by Barbara Szurgot rough-in p/s u/g n ok
|
Electrical Rough-In | 2/2/2015 | 2/3/2015 | 2/3/2015 | A | PASS |
Daryl DeGrange
|
|
|
Ceiling inspection. Phone #: ###-#### Inspection requested via web by Barbara Szurgot rough-in ok cover ceiling grid
|
Electrical Rough-In | 1/27/2015 | 1/28/2015 | 1/28/2015 | A | PASS |
Rock A. Hudson
|
|
|
Wall rough in inspection Phone #: ###-#### Inspection requested via web by Barbara Szurgot Wall rough in ok cover
|
Electrical Rough-In | 1/15/2015 | 1/16/2015 | 1/16/2015 | P | PASS |
Rock A. Hudson
|
|
|
Trenching inspection. Cal Doug at ###-#### with any questions. Phone #: ###-#### Inspection requested via web by Barbara Szurgot Under slab just in front door rough in ok cover
|