Final | 3/23/2015 | 3/23/2015 | 3/23/2015 | P | PASS |
Rex Boyles
|
|
|
Jose-14th floor Phone #: ###-#### final ok 14th flr
|
Final | 3/19/2015 | 3/20/2015 | 3/20/2015 | P | PASS |
Rex Boyles
|
|
|
15th // Jose Phone #: ###-#### final ok 15th flr
|
Electrical Rough-In | 2/23/2015 | 2/23/2015 | 2/23/2015 | P | PASS |
Rex Boyles
|
|
|
14th floor // Jose Phone #: ###-#### r/i ceilings ok to cover
|
Electrical Rough-In | 2/17/2015 | 2/17/2015 | 2/17/2015 | P | PASS |
Rex Boyles
|
|
|
15th floor // Jose Phone #: ###-#### r/i ceilings ok
|
Electrical Rough-In | 2/2/2015 | 2/3/2015 | 2/3/2015 | A | PASS |
Cevyn Recla
|
|
|
Jose// 14th floor Phone #: ###-#### Walls OK to cover 14th floor, grounds checked and ok for walls 15th floor
|
Electrical Rough-In | 1/28/2015 | 1/28/2015 | 1/28/2015 | P | PASS |
Rex Boyles
|
|
|
Jose Phone #: ###-#### 15th floor r/i walls ok confirm ground wire is solid under ground screw in each 4 sq. box upon return
|
Conference | 1/26/2015 | 1/27/2015 | 1/27/2015 | A | DONE |
Rex Boyles
|
|
|
Jose Phone #: ###-#### discuss ceiling work and seismic requirements for ti"s
|