Final | 1/27/2016 | 1/27/2016 | 1/27/2016 | P | PASS |
Rex Boyles
|
|
|
Jay Phone #: ###-#### corrections made both units final ok
|
Conference | 1/20/2016 | 1/20/2016 | 1/20/2016 | P | PASS |
Daryl DeGrange
|
|
|
Discussed service sub-panel locations with Brain Millard. Determined both service panel overcurrent devices shall be relocated outside bathroom areas according to NEC 230.70(A)(2) and 240.24(E)
|
Final | 1/13/2016 | 1/13/2016 | 1/13/2016 | P | FAIL |
Rex Boyles
|
|
|
Jay Phone #: ###-#### 210.8(A)(7)-receptacles within 6 foot of sink shall be GFCI protected, 314.20-add a depth ring required on receptacle where not flush with combustable material (hood). 240.24(D)(E)- in dwelling units overcurrent devices , other than supplementary overcurrent protection , shall not be located in bathrooms.
|
Electrical Rough-In | 2/20/2015 | 2/20/2015 | 2/20/2015 | P | PASS |
Rex Boyles
|
|
|
Jay Phone #: ###-#### r/i ok inside of the 2 units only r/i needed for greenhouse when ready
|
Permanent Service | 2/20/2015 | 2/20/2015 | 2/20/2015 | P | PASS |
Rex Boyles
|
|
|
Jay Phone #: ###-#### p/s o/h n ok (2 meters) (not sure of addressses for 2-rear units??)
|