Final | 2/6/2015 | 2/6/2015 | 2/6/2015 | P | PASS |
Rock A. Hudson
|
|
|
###-#### Final ok
|
Permanent Service | 2/6/2015 | 2/6/2015 | 2/6/2015 | P | PASS |
Rock A. Hudson
|
|
|
###-#### Underground shallow due to rock hit and installed in rigid conduit. p/s u/g n ok
|
Permanent Service | 2/5/2015 | 2/6/2015 | 2/6/2015 | A | FAIL |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Don Conley 250.24- Premisis wiring shall have a grounding electode system conductor connected to the grounded conductor at each service. 250.92-Standard locknuts and bushings shall not be only means of bonding metal raceway on supply side of service.
|
Permanent Service | 2/6/2015 | 2/6/2015 | | A | |
|
|
|
###-#### // Troy
|