Final | 5/6/2015 | 5/7/2015 | 5/7/2015 | A | PASS |
Rock A. Hudson
|
|
|
Request to re inspect for final- for the AM- we fixed the previous problems. please call Kyle if questions ###-#### Phone #: ###-#### Inspection requested via web by Shane Lott Final ok
|
Final | 5/4/2015 | 5/5/2015 | 5/5/2015 | A | FAIL |
Rock A. Hudson
|
|
|
Please call cody for questions Thanks Phone #: ###-#### Inspection requested via web by Shane Lott Starbucks track lights MC damaged at connector 110.12(B). Unable to test all areas due to them being open and operating at time of inspection.
|
Electrical Rough-In | 4/2/2015 | 4/3/2015 | 4/3/2015 | A | PASS |
Rock A. Hudson
|
|
|
Wall rough in inspection - Wall in front of Floral area Please call Kyle for any questions ###-#### Phone #: ###-#### Inspection requested via web by Shane Lott Floral to right of south entrance 1/2 wall rough in ok cover
|
Electrical Rough-In | 3/20/2015 | 3/23/2015 | 3/23/2015 | A | PASS |
Rock A. Hudson
|
|
|
Ceiling inspection call Cody if questions ###-#### Phone #: ###-#### Inspection requested via web by Shane Lott Pharmacy Grid rough in ok cover
|
Electrical Rough-In | 3/12/2015 | 3/13/2015 | 3/13/2015 | A | PASS |
Rock A. Hudson
|
|
|
Ceiling rough in inspection in the Starbucks area please call cody if you have questions ###-#### Phone #: ###-#### Inspection requested via web by Shane Lott Starbucks located in front of store grid rough in ok cover
|
Electrical Rough-In | 3/10/2015 | 3/10/2015 | 3/10/2015 | A | PART |
Rock A. Hudson
|
|
|
Cody Phone #: ###-#### Albertsons pharmacy soffit, consultation rm, bathroom, walls and hard lids, and front wall by cart storage rough in ok cover
|