Final | 7/18/2016 | 7/18/2016 | 7/18/2016 | P | PASS |
James Ady
|
|
|
Max Phone #: ###-#### Corrections made final ok
|
Final | 7/13/2016 | 7/14/2016 | 7/14/2016 | P | FAIL |
James Ady
|
|
|
Max Phone #: ###-#### 110.26. Working space in front of panel board. (plumbing on floor)
|
Electrical Rough-In | 2/29/2016 | 3/1/2016 | 3/1/2016 | A | PASS |
Eric Story
|
|
|
Restroom r/i - Max Phone #: ###-#### bathroom cielings ok cover
|
Electrical Rough-In | 2/19/2016 | 2/22/2016 | 2/22/2016 | A | PASS |
Eric Story
|
|
|
Max Phone #: ###-#### ejector pump install ok
|
Permanent Service | 1/21/2016 | 1/22/2016 | 1/22/2016 | A | PASS |
Eric Story
|
|
|
Max Phone #: ###-#### p/s u/g n ok
|
Electrical Rough-In | 12/17/2015 | 12/18/2015 | 12/18/2015 | A | PASS |
Eric Story
|
|
|
Max Phone #: ###-#### main service grounding and undergrund ok cover
|
Electrical Rough-In | 12/1/2015 | 12/2/2015 | 12/2/2015 | A | PASS |
Eric Story
|
|
|
Underground - Max Phone #: ###-#### shelter B and fiber conduits ok cover
|
Electrical Rough-In | 11/23/2015 | 11/23/2015 | 11/23/2015 | P | PASS |
Eric Story
|
|
|
Max Phone #: ###-#### main trench ok cover
|
Electrical Rough-In | 11/20/2015 | 11/20/2015 | 11/20/2015 | P | PASS |
Eric Story
|
|
|
Max Phone #: ###-#### shelter A underground ok cover
|
Electrical Rough-In | 11/18/2015 | 11/19/2015 | 11/19/2015 | P | PASS |
Eric Story
|
|
|
underground; Max Phone #: ###-#### underground for bathroom and grounding ok cover
|
Electrical Rough-In | 6/4/2015 | 6/5/2015 | 6/5/2015 | A | PASS |
Eric Story
|
|
|
underground; Max Phone #: ###-#### rough-in u/g ok cover
|
Temporary Service | 6/3/2015 | 6/3/2015 | 6/3/2015 | P | PASS |
Eric Story
|
|
|
Max Phone #: ###-#### t/s u/g n ok
|
Electrical Rough-In | 4/7/2015 | 4/7/2015 | 4/7/2015 | P | PASS |
Daryl DeGrange
|
|
|
Underground for cover - Brian Phone #: ###-#### rough-in ok cover trenches as per highlighted and dated 4/07/15 on plans
|
Electrical Rough-In | 4/2/2015 | 4/3/2015 | 4/3/2015 | A | PASS |
Rex Boyles
|
|
|
Underground // Brian Phone #: ###-#### u. ground conduits to de watering pumps ok see plans
|
Temporary Service | 2/25/2015 | 2/26/2015 | 2/26/2015 | P | PART |
Cevyn Recla
|
|
|
Brian Phone #: ###-#### Power to two temporary job trailers, 100 amp each
|
Temporary Service | 2/24/2015 | 2/25/2015 | 2/25/2015 | P | PART |
Cevyn Recla
|
|
|
brian Phone #: ###-#### inspection on meter to get power, still need to see wiring to trailers. TS, UG, N, OK
|