Final | 3/24/2015 | 3/24/2015 | 3/24/2015 | P | PASS |
Bob Reichert
|
|
|
ALL DONE Phone #: ###-#### Inspection requested via web by MARK PINNEY ok final, signed card
|
Electrical Rough-In | 3/17/2015 | 3/18/2015 | 3/18/2015 | A | PASS |
Bob Reichert
|
|
|
CEILING ROUGH IN Phone #: ###-#### Inspection requested via web by MARK PINNEY corrections made, ok cover ceiling
|
Electrical Rough-In | 3/13/2015 | 3/16/2015 | 3/16/2015 | P | CANC |
Bob Reichert
|
|
|
CEILING FOR COVER. TO BE ABLE TO INSTALL CEILING TILES Phone #: ###-#### Inspection requested via web by MARK PINNEY told contractor that they shall provide ceiling wires for existing fixtures and no lv shall be supported by grid or tiles
|
Electrical Rough-In | 2/26/2015 | 2/27/2015 | 2/27/2015 | A | PASS |
Bob Reichert
|
|
|
WALL ROUGH IN Phone #: ###-#### Inspection requested via web by MARK PINNEY walls only ok cover
|
Electrical Rough-In | 2/25/2015 | 2/27/2015 | 2/26/2015 | P | CANC |
Bob Reichert
|
|
|
WALL ROUGH IN FOR COVER Phone #: ###-#### >> Inspection requested via web by MARK PINNEY Inspection cancelled from web by: MARK PINNEY
|