DOC - Permit Expired | 2/4/2019 | 2/4/2019 | 2/4/2019 | P | PASS |
Daryl DeGrange
|
|
|
No activity within 180 days. This permit is EXPIRED. A new permit is required to complete this job.
|
Permanent Service | 5/13/2015 | 5/13/2015 | 5/13/2015 | P | PASS |
Daryl DeGrange
|
|
|
Inspection requested via web by Eddy Udry p/s o/h connection of solar photovoltaic system ok
|
Electrical Rough-In | 5/12/2015 | 5/12/2015 | 5/12/2015 | P | PASS |
Daryl DeGrange
|
|
|
ETL listed array modules, rough-in ok
|
Final | 5/11/2015 | 5/11/2015 | 5/11/2015 | P | CANC |
Daryl DeGrange
|
|
|
would like call 30min ahead; Eddie Phone #: ###-#### Contractor will reschedule for required rough-in inspection. Rough-in inspection is an visual of array panels listing and bonding of array structure.
|