Final | 3/31/2015 | 4/1/2015 | 4/1/2015 | A | PASS |
Rex Boyles
|
|
|
Mike Phone #: ###-#### final ok
|
Permanent Service | 3/12/2015 | 3/12/2015 | 3/12/2015 | P | PASS |
Rex Boyles
|
|
|
Mike Phone #: ###-#### p/s o/h n ok (old drop is damaged)
|
Conference | 3/3/2015 | 3/4/2015 | 3/4/2015 | A | DONE |
Rex Boyles
|
|
|
Call half hour before to meet there // Michael Phone #: ###-#### discuss service upgrade and reusing existing loadcenter after relocating to meet required clearances. Install new grounding electrodes and conductors.
|