Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberELE15-00685
StatusFinaled
Name L & K ELECTRIC
Site Address 510 W HAYS ST
Project Name 
Customer Number2083751653
ePlanReviewNo
Description
Electrical Permit - Alteration: Service change to supply power to 3 separate meters from one and wire downstairs apartment
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final9/8/20179/11/20179/11/2017APASS
DetailsMark Moncarr
David Forbes ###-#### Inspection for upstairs (8643) Phone #: ###-#### Inspection requested via web by Samatha Solberg Ok final. Talked to David, he is going to fix PF canopy and send pics.
Electrical Rough-In7/17/20177/18/20177/18/2017APASS
DetailsMark Moncarr
David Forbes ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg Ok cover. Was asked to verify blocking above door going into bath. Blocking is present in locations marked.
Final3/2/20163/4/20163/4/2016ACANC
DetailsEric Story
Final inspection please. Please contact Gary Allen prior to arrival at ###-#### as he will have a key to let you in. If you have any electrical questions please contact David Forbes at ###-#### as he will not be at this location. Thank you so much and have a super day! Phone #: ###-#### Inspection requested via web by Laura Longshaw called and no one answered nor a phone call back
Final2/10/20162/10/20162/10/2016PCANC
DetailsEric Story
Final inspection for this permit please. You can contact the owner Douglas Peterson at ###-#### if you need to get inside the property. Thank you so much and have a super day! Phone #: ###-#### Inspection requested via web by Laura Longshaw called contractor and contact to access building no answer or call back
Electrical Rough-In8/10/20158/10/20158/10/2015PPASS
DetailsEric Story
Rough in wall inspection. David Forbes will be your contact. Please call him at ###-#### if you have any questions as he will not be on this job site. Thank you and have a great day. Phone #: ###-#### Inspection requested via web by Laura Longshaw rough-in ok cover
Final7/30/20157/31/20157/31/2015APASS
DetailsEric Story
Final inspection please. If you have any questions or problems please call David Forbes ###-#### as he will not be on site. Thank you so much and have a wonderful day! Phone #: ###-#### Inspection requested via web by Laura Longshaw service final ok
Permanent Service7/13/20157/14/20157/14/2015APASS
DetailsEric Story
The have built a step for the mail service and is ready for permanent service inspection. David Forbes is your contact ###-#### if you have any questions as he will not be on site. Thank you. Phone #: ###-#### Inspection requested via web by Laura Longshaw contractor will finish deck to maintain working clearences in front of meter pack p/s o/h rec ok 3 meters
Permanent Service7/2/20157/6/20157/6/2015ACANC
DetailsEric Story
This inspection will be for the outside meter only. Contact is David Forbes ###-####. Please call ahead of time as he may not be on location. Phone #: ###-#### Inspection requested via web by Laura Longshaw to busy