Final | 5/29/2015 | 5/29/2015 | 5/29/2015 | P | PASS |
Rock A. Hudson
|
|
|
Call Ryan with any questions. Thank you Correction fixed Phone #: ###-#### Inspection requested via web by Thomas Jenkins final ok
|
Final | 5/27/2015 | 5/28/2015 | 5/28/2015 | A | FAIL |
Daryl DeGrange
|
|
|
You can contact me if you would like to meet me for inspection. Thank you Ryan Van Metre ###-#### Phone #: ###-#### Inspection requested via web by Thomas Jenkins NEC 210.8 (A)(2) All 15 and 20 ampere 120 volt receptacles in garages require GFCI protection (washer receptacle)
|
Electrical Rough-In | 5/1/2015 | 5/1/2015 | 5/1/2015 | P | PASS |
Daryl DeGrange
|
|
|
This rough in inspection is for the line side of the solar system. They told me we needed to have you inspect before they could call in their final. Please call Ryan with any questions. Thank you Phone #: ###-#### Inspection requested via web by Thomas Jenkins rough-in ok solar connection.
|
Electrical Rough-In | 3/31/2015 | 4/1/2015 | 4/1/2015 | P | PASS |
Daryl DeGrange
|
|
|
Rough in inspection for garage and service conduits. Thank you Phone #: ###-#### Inspection requested via web by Thomas Jenkins rough-in garage and underground ok cover
|
Electrical Rough-In | 3/18/2015 | 3/19/2015 | 3/19/2015 | P | PART |
Bob Reichert
|
|
|
Electrical rough in for building and cover for trench. We will leave one end open for final connections. Please feel free to call with any questions or if you would like us to meet you there. Phone #: ###-#### Inspection requested via web by Thomas Jenkins called, ok cover u/g house to garage
|