Electrical Rough-In | 5/8/2015 | 5/8/2015 | 5/8/2015 | P | PASS |
Rex Boyles
|
|
|
Ceiling inspection at remodeled Starbucks Phone #: ###-#### Inspection requested via web by kendall bender r/i ceiling ok
|
Final | 5/8/2015 | 5/8/2015 | 5/8/2015 | P | PASS |
Rex Boyles
|
|
|
Ceiling inspection at remodeled Starbucks Phone #: ###-#### Inspection requested via web by kendall bender corrections made and loadcenter marked "fed from " labeled final ok
|
Electrical Rough-In | 5/5/2015 | 5/5/2015 | 5/5/2015 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by kendall bender UL listing confirmed on Starbucks kiosk. Equipment ground from panel to frame work due to raceways attached. Asked contractor to label panel noting circuit for register off building emergence system. All other power from panel in kiosk. Walls of kiosk rough in ok cover
|
Electrical Rough-In | 5/1/2015 | 5/1/2015 | 5/1/2015 | P | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### Inspection requested via web by kendall bender ok cover wall
|
Electrical Rough-In | 4/23/2015 | 4/24/2015 | 4/24/2015 | P | PASS |
Bob Reichert
|
|
|
This is a remodel on a functioning store so if possible please call prior to visit Phone #: ###-#### Inspection requested via web by kendall bender u/g only ok cover at starbucks
|