Electrical Rough-In | 4/1/2015 | 4/2/2015 | 4/2/2015 | A | PASS |
Rock A. Hudson
|
|
|
Added 15 solar panels to an existing array.
The only changes electrically, was I relocated the knife switch from the far corner of the house were the meter base is located, to the detached garage where the solar array and a existing sub panel is located.
The array was completed before a formal understanding of the new rough in inspection process was addressed, so give me a call when your heading out, and I''ll meet you there with ladder and mirrors to inspect label plates on panels and inverters. All the rail and panel bonding is easily seen as is.
Thanks guys, Ryan King 208.850.8965
Phone #: ###-#### Inspection requested via web by Ryan King UL listing confirmed of grounded system. Grounding electrode system from original installation. Signage complete. Rough in ok
|
Final | 4/2/2015 | 4/2/2015 | 4/2/2015 | P | PASS |
Rock A. Hudson
|
|
|
Added 15 solar panels to an existing array.
The only changes electrically, was I relocated the knife switch from the far corner of the house were the meter base is located, to the detached garage where the solar array and a existing sub panel is located.
The array was completed before a formal understanding of the new rough in inspection process was addressed, so give me a call when your heading out, and I''ll meet you there with ladder and mirrors to inspect label plates on panels and inverters. All the rail and panel bonding is easily seen as is.
Thanks guys, Ryan King 208.850.8965
Phone #: ###-#### Inspection requested via web by Ryan King Final ok
|