Final | 4/22/2015 | 4/22/2015 | 4/22/2015 | P | PASS |
Rock A. Hudson
|
|
|
Jay Phone #: ###-#### Final ok
|
Electrical Rough-In | 4/22/2015 | 4/22/2015 | 4/22/2015 | P | PASS |
Rock A. Hudson
|
|
|
Jay Phone #: ###-#### Grid rough in ok cover
|
Final | 4/22/2015 | 4/22/2015 | 4/22/2015 | P | FAIL |
Rock A. Hudson
|
|
|
Jay Phone #: ###-#### 400.8(5)- Flexible cords shall not be located above drop or suspended ceilings
|
Final | 4/21/2015 | 4/21/2015 | 4/21/2015 | P | NR |
Rock A. Hudson
|
|
|
Jay Phone #: ###-#### Lights need wired, close junction box in back corner above grid, finish ansel system for outlet test.
|