Final | 12/21/2015 | 12/21/2015 | 12/21/2015 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by JOHN MCCURDY All corrections and finish wiring shall be covered under ELE15-04041. Final ok
|
Final | 11/20/2015 | 11/20/2015 | 11/20/2015 | P | FAIL |
Rock A. Hudson
|
|
|
I need a partial because the people are moving in... There''s certain things that aren''t done on the exterior.... Phone #: ###-#### Inspection requested via web by JOHN MCCURDY * All required receptacles and lighting outlets listed in artical 210 ahll be installed and operational for final. 300.15- All cables shall terminate in boxes. 110.3-Bath fan located in shower stall shall have GFCI protection. 210.52- Receptacle outlets shall be located with in 6' of fixed panel on back slider. Too many items to list. Unable to test all receptacles due to items have been moved in prior to inspection.
|
Electrical Rough-In | 9/8/2015 | 9/8/2015 | 9/8/2015 | P | PASS |
Rock A. Hudson
|
|
|
This is an inspection for Floor Heat only. Installed per manufacture specs.. Early afternoon would be appreciated. Customer is ready to cover and seal floor for tile... Thank you... Phone #: ###-#### Inspection requested via web by JOHN MCCURDY Floor heat in kitchen, main bath, and master bath rough in ok cover
|
Electrical Rough-In | 7/22/2015 | 7/22/2015 | 7/22/2015 | A | PASS |
Daryl DeGrange
|
|
|
Ground work only...Inspection for Conduit in ditch for post light landscaping, etc..... Needs to be covered this afternoon... Phone #: ###-#### Inspection requested via web by JOHN MCCURDY Rough-in ok cover trenches
|
Rough-In Permanent Service | 4/23/2015 | 4/24/2015 | 4/24/2015 | A | PASS |
Rock A. Hudson
|
|
|
Check peak dry sheet and make up. John ###-#### Rough in ok cover p/s u/g n ok
|
Rough-In Permanent Service | 4/22/2015 | 4/23/2015 | 4/23/2015 | P | PART |
Rock A. Hudson
|
|
|
We will be ready by 1:00 or 2:00 PM... I will call around noon to verify our progress. Thank you... Phone #: ###-#### Inspection requested via web by JOHN MCCURDY Will come by next day to confirm make up and dry sheet peak of roof do to storm expected. OK foam seal.
|