Final | 3/7/2019 | 3/7/2019 | 3/7/2019 | P | PASS |
Mark Moncarr
|
|
|
Ok final. Bath GFI's and floor heat GFI protection function properly.
|
ELE-Aging Inspection | 2/12/2019 | 2/12/2019 | 2/12/2019 | | DONE |
Mark Moncarr
|
|
|
Left card at front door location stating that floor heat in mstr bath needed inspected after contractor install for previous homeowners.
|
Final | 9/14/2015 | 9/15/2015 | 9/15/2015 | P | FAIL |
Eric Story
|
|
|
Please call Todd ###-#### a half hour before arriving. Phone #: ###-#### Inspection requested via web by Randy Fletcher 314.28 (c)all j-boxes shall have a listed covers
|
Electrical Rough-In | 7/1/2015 | 7/2/2015 | 7/2/2015 | A | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Fletcher master bath floor heat rough-in cover ok
|
Electrical Rough-In | 6/1/2015 | 6/1/2015 | 6/1/2015 | P | PART |
Eric Story
|
|
|
on electrical for under tile in bath remodel. Please call Todd at ###-#### when on way Phone #: ###-#### Inspection requested via web by Randy Fletcher floor heat ok cover other then shower pan
|
Electrical Rough-In | 3/30/2015 | 3/31/2015 | 3/31/2015 | A | PASS |
Daryl DeGrange
|
|
|
Bathroom remodel rough in Phone #: ###-#### Inspection requested via web by Randy Fletcher rough-in ok cover
|
Electrical Rough-In | 3/27/2015 | 3/30/2015 | 3/30/2015 | P | CANC |
Daryl DeGrange
|
|
|
Bathroom remodel Phone #: ###-#### >> Inspection requested via web by Randy Fletcher Inspection cancelled from web by: Randy Fletcher
|