Permit Information
Permit NumberELE15-00830
StatusFinaled
Name TRI STATE ELECTRIC
Site Address 1001 W IDAHO ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Electrical Permit - Alteration: Electrical for the remodel of the 2nd Story, 3rd Story, 4th Story and Penthouse.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final4/15/20164/18/20164/18/2016PPASS
DetailsRex Boyles
CONTACT - DERRICK KAMPER Phone #: ###-#### Inspection requested via web by Deb Gooden final ok
Electrical Rough-In11/18/201511/19/201511/19/2015PPASS
DetailsRex Boyles
Contact: Jeremiah Goins. final for the 4th floor please Phone #: ###-#### Inspection requested via web by Deb Gooden final ok 4th flr perm. occupancy ok 4th floor
Electrical Rough-In10/23/201510/26/201510/26/2015APASS
DetailsRex Boyles
Contact: Jeremiah Goins - final for the 2nd floor only please Phone #: ###-#### Inspection requested via web by Deb Gooden final ok 2nd flr perm. occupancy ok on 2nd and 3rd floors.
Electrical Rough-In10/22/201510/23/201510/23/2015PPART
DetailsRex Boyles
CONTACT: JEREMIAH GOINS - FINAL INSPECTION FOR 2ND ; 3RD FLOORS Phone #: ###-#### Inspection requested via web by Deb Gooden 3rd floor final ok will look for bond to server rack next inspection will return to inspect 2nd floor early when office workers are not in the way
Electrical Rough-In10/21/201510/22/201510/22/2015APASS
DetailsRex Boyles
Contact: Jeremiah Goins - ceiling inspection please Phone #: ###-#### Inspection requested via web by Deb Gooden r/i t bar ceilings ok on 4th floor
Electrical Rough-In10/13/201510/14/201510/14/2015APASS
DetailsRex Boyles
Contact: Jeremiah Goins - 3rd floor Final inspection please Phone #: ###-#### Inspection requested via web by Deb Gooden partial final on 3rd floor. All done except cubicles not in yet. TEMP. OCCUPANCY OK on 3rd floor
Electrical Rough-In10/12/201510/13/201510/13/2015PCANC
DetailsRex Boyles
Contact: Jeremiah Goins - Final inspection for the 3rd floor please Phone #: ###-#### >> Inspection requested via web by Deb Gooden Inspection cancelled from web by: Deb Gooden
Electrical Rough-In9/30/201510/1/201510/1/2015PPASS
DetailsRock A. Hudson
Contact: Jeremiah Goins - ceiling inspection, late morning, close to noon if possible please Phone #: ###-#### Inspection requested via web by Deb Gooden 3rd floor ceiling grid rough in ok cover
Electrical Rough-In9/18/20159/21/20159/21/2015PPASS
DetailsRex Boyles
Contact: Jeremiah Goins - 4th floor rough-in please Phone #: ###-#### Inspection requested via web by Deb Gooden r/i ceilings conf. rm, bathrms, and elevator lobby ok
Electrical Rough-In8/31/20159/1/20159/1/2015APASS
DetailsRex Boyles
CONTACT: JEREMIAH GOINS Phone #: ###-#### Inspection requested via web by Deb Gooden r/i walls 3rd floor ok
Electrical Rough-In6/29/20156/30/20156/30/2015APART
DetailsRex Boyles
Contact: Jeremiah Goins. Final for the 2nd floor Phone #: ###-#### Inspection requested via web by Deb Gooden 2nd flr final ok except cubicles not installed yet
Conference5/20/20155/21/20155/21/2015ADONE
DetailsRex Boyles
Contact: Jeremiah Goins - 2nd floor conf. inspection please Phone #: ###-#### Inspection requested via web by Deb Gooden discuss clearance above 2nd flr panelboards. Limited space because of HVAC, OK with Jeramiah as far as being able to get his electrical in. Making an exception on this installation in regards to 110.26 (A)(3) height above panel
Electrical Rough-In5/14/20155/15/20155/15/2015APASS
DetailsDaryl DeGrange
Contact: Jeremiah Goins, Late morning inspection please Phone #: ###-#### Inspection requested via web by Deb Gooden rough-in ok cover 2n floor walls
Conference4/8/20154/8/20154/8/2015PDONE
DetailsRex Boyles
Contact on site is Jeremiah Goins cell phone # ###-#### Phone #: ###-#### Inspection requested via web by Deb Gooden meet with arch. and elect. eng. and Jeramiah to discuss 2 hr barrier for fire pump system