Final | 9/30/2015 | 10/2/2015 | 10/2/2015 | P | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by HZ ZAHIC final ok
|
Electrical Rough-In | 6/25/2015 | 6/26/2015 | 6/26/2015 | A | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by HZ ZAHIC detached garage rough-in ok cover
|
Permanent Service | 4/7/2015 | 4/8/2015 | 4/8/2015 | A | PASS |
Daryl DeGrange
|
|
|
Will be ready around 10:00 AM . Phone #: ###-#### Inspection requested via web by HZ ZAHIC Existing overhead service location changed to underground, p/s o/h rec ok
|
Electrical Rough-In | 3/31/2015 | 4/1/2015 | 4/1/2015 | A | PASS |
Daryl DeGrange
|
|
|
Underground conduit for elec. service Phone #: ###-#### Inspection requested via web by HZ ZAHIC Rough-in ok cover underground service feeder to house and detacted garage
|