Final | 10/5/2015 | 10/6/2015 | 10/6/2015 | A | PASS |
Eric Story
|
|
|
Dave is on site at 7am this morning to fix the outlet problem. Phone #: ###-#### Inspection requested via web by Don Lustig corrections fixed final ok
|
Final | 10/5/2015 | 10/5/2015 | 10/5/2015 | P | FAIL |
Eric Story
|
|
|
Ready for final Phone #: ###-#### Inspection requested via web by Don Lustig 110.4 voltages receptacle in office facing front street is not reading proper(possible 240v present)
|
Electrical Rough-In | 10/5/2015 | 10/5/2015 | 10/5/2015 | P | PASS |
Eric Story
|
|
|
Ready for final Phone #: ###-#### Inspection requested via web by Don Lustig remaining cielings ok cover
|
Electrical Rough-In | 9/30/2015 | 10/1/2015 | 10/1/2015 | A | PASS |
Rex Boyles
|
|
|
partial ceiling cover for the carpeted areas office 1,2,3 and open office, the conference and entry are not ready Phone #: ###-#### Inspection requested via web by Don Lustig r/i ceilings ok 1,2 and 3 and open office south area.
|
Electrical Rough-In | 5/26/2015 | 5/27/2015 | 5/27/2015 | A | PASS |
Rock A. Hudson
|
|
|
Steve Phone #: ###-#### Wall rough in ok cover
|