Final | 4/17/2015 | 4/17/2015 | 4/17/2015 | P | PASS |
Rex Boyles
|
|
|
Corrections made. Phone #: ###-#### Inspection requested via web by Jason Wicks corrections made final ok
|
Final | 4/17/2015 | 4/17/2015 | 4/17/2015 | A | FAIL |
Rex Boyles
|
|
|
Panel is Labled. Ready for final Phone #: ###-#### Inspection requested via web by Jason Wicks strap 2" riser. 250.94-install intersystem bonding terminal strip with #6 ground conductor
|
Permanent Service | 4/15/2015 | 4/15/2015 | 4/15/2015 | A | PASS |
Rex Boyles
|
|
|
I will Lable panel when power is back on Phone #: ###-#### Inspection requested via web by Jason Wicks p/s o/h rec ok NOTE TO CONTRACTOR :Meter should be at 5' 6" to center whenever possible + or - 6"
|