Final | 7/17/2015 | 7/17/2015 | 7/17/2015 | P | PASS |
Eric Story
|
|
|
Inspection requested via web by Spencer McLean final ok
|
Final | 7/16/2015 | 7/17/2015 | 7/17/2015 | A | FAIL |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Spencer McLean 210.8 (5) receptacles located with 6' of outside edge of a sink shall be GFCI protection/GFCI for water fountain shall be readily accessible
|
Electrical Rough-In | 7/7/2015 | 7/8/2015 | 7/8/2015 | A | PASS |
Eric Story
|
|
|
Ceiling inspection Phone #: ###-#### Inspection requested via web by Spencer McLean 2nd floor remaining electricall rough-in ok cover
|
Electrical Rough-In | 7/7/2015 | 7/7/2015 | 7/7/2015 | P | NH |
Eric Story
|
|
|
cieling inspection Phone #: ###-#### Inspection requested via web by Spencer McLean no access
|
Electrical Rough-In | 6/25/2015 | 6/25/2015 | 6/25/2015 | P | PASS |
Eric Story
|
|
|
Ceiling inspection Phone #: ###-#### Inspection requested via web by Spencer McLean ceiling grid as per contractors print cover ok
|
Electrical Rough-In | 6/23/2015 | 6/23/2015 | 6/23/2015 | P | NR |
Eric Story
|
|
|
Please inspect the ceiling for cover. Phone #: ###-#### Inspection requested via web by Spencer McLean not ready
|
Electrical Rough-In | 4/16/2015 | 4/17/2015 | 4/17/2015 | A | PASS |
Rex Boyles
|
|
|
inspection for cover on the walls Phone #: ###-#### Inspection requested via web by Spencer McLean r/i new walls ok look for ground make up in 4sq. boxes on next inspection. NOTE: grounds must be made up in the future prior to r/i
|