Final | 5/28/2015 | 5/29/2015 | 5/29/2015 | P | PASS |
Daryl DeGrange
|
|
|
Scott Phone #: ###-#### final ok
|
Electrical Rough-In | 5/5/2015 | 5/6/2015 | 5/6/2015 | P | PASS |
Rock A. Hudson
|
|
|
Scott Phone #: ###-#### Rear, dividing, and front walls. Surface mount receptacle outlets rough in ok cover
|
Permanent Service | 5/4/2015 | 5/5/2015 | 5/4/2015 | A | PASS |
Rex Boyles
|
|
|
Todd Phone #: ###-#### p/s o/h rec ok will look for water bond and bonding of nuetral and fault current label at main disconnect at final inspection
|
Permanent Service | 4/21/2015 | 4/22/2015 | 4/22/2015 | A | PART |
Daryl DeGrange
|
|
|
Scott Phone #: ###-#### p/s o/h n ok tap exsisting main disconnect
|
Conference | 4/20/2015 | 4/20/2015 | 4/20/2015 | P | DONE |
Rex Boyles
|
|
|
Call Todd at ###-#### before heading over so he can meet inspector on site. Thank you Phone #: ###-#### Inspection requested via web by Todd Sellman After inspecting existing service and grounding, a whole new service drop for 125 amp 120/240 volt 1 phase for 1017 Main Street would be recommened with new grounding electrode to water service entering bldg. Also confirm existing 400 amp electrical service has good ground to earth and tie new service into it. Location for new meter ok if clearances are satisfied. Tieing into existing service will have issues with separating nuetral and ground.
|