Final | 5/29/2015 | 6/1/2015 | 6/1/2015 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Karl Paige Final ok
|
Final | 5/22/2015 | 5/22/2015 | 5/22/2015 | P | FAIL |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Karl Paige spark 314.20 In Wall or Ceiling. In walls or ceilings with a surface of concrete, tile, gypsum, plaster, or other noncombustible material, boxes employing a flush-type cover or faceplate shall be installed so that the front edge of the box, plaster ring, extension ring, or listed extender will not be set back of the finished surface more than 6 mm (1/4 in.). In walls and ceilings constructed of wood or other combustible surface material, boxes, plaster rings, extension rings, or listed extenders shall be flush with the finished surface or project therefrom 314.25 Covers and Canopies. In completed installations, each box shall have a cover 110.3 wire as listed no ground in gfci in breakroom verbal notification with contractor
|
Electrical Rough-In | 5/12/2015 | 5/12/2015 | 5/12/2015 | P | PASS |
Rock A. Hudson
|
|
|
Ceiling cover Phone #: ###-#### Inspection requested via web by Karl Paige Dining room grid rough in ok cover
|
Electrical Rough-In | 4/24/2015 | 4/24/2015 | 4/24/2015 | A | PASS |
Rock A. Hudson
|
|
|
wall cover Phone #: ###-#### Inspection requested via web by Karl Paige Bathrooms moved light over sink and over shower rough in ok cover
|