Final | 6/3/2015 | 6/3/2015 | 6/3/2015 | P | PASS |
Eric Story
|
|
|
ready for final call dave with questions Phone #: ###-#### Inspection requested via web by Don Lustig final ok bathroom basement and outlets added on main floor
|
Electrical Rough-In | 6/3/2015 | 6/3/2015 | 6/3/2015 | P | PASS |
Eric Story
|
|
|
ready for inspection ceiling cover call dave with questions Phone #: ###-#### Inspection requested via web by Don Lustig ceiling grid ok cover basement and reception
|
Electrical Rough-In | 5/19/2015 | 5/20/2015 | 5/20/2015 | A | PASS |
Rex Boyles
|
|
|
rough in the upstairs counter and reception area Phone #: ###-#### Inspection requested via web by Don Lustig r/i reception counter receps. and data ok to cover
|
Electrical Rough-In | 5/5/2015 | 5/6/2015 | 5/6/2015 | P | PASS |
Rex Boyles
|
|
|
upstairs wall and ceiling restroom Phone #: ###-#### Inspection requested via web by Don Lustig bathroom and new reception wall r/i ok
|
Electrical Rough-In | 4/29/2015 | 4/30/2015 | 4/30/2015 | P | PASS |
Rex Boyles
|
|
|
call dave with questions, this is for the basement rough in walls Phone #: ###-#### Inspection requested via web by Don Lustig r/i bsmt. walls ok
|