Final | 7/22/2015 | 7/22/2015 | 7/22/2015 | P | PASS |
Rock A. Hudson
|
|
|
Swimming pool electrical Phone #: ###-#### Inspection requested via web by Lars Johnson Pool Final ok
|
Electrical Rough-In | 6/4/2015 | 6/5/2015 | 6/5/2015 | P | PASS |
Rock A. Hudson
|
|
|
Swimming pool light - potting compound Phone #: ###-#### Inspection requested via web by Lars Johnson Rough in ok cover
|
Final | 5/2/2015 | 5/5/2015 | 5/5/2015 | P | CANC |
Rock A. Hudson
|
|
|
Underground for (1) light, and bonding for (4) EQ plane, (1) handrail, (1) grabrail, (1) handicap lift, (1) cage/equipment, Phone #: ###-#### Inspection requested via web by Lars Johnson Needed rough in inspection
|
Electrical Rough-In | 5/5/2015 | 5/5/2015 | 5/5/2015 | P | PASS |
Rock A. Hudson
|
|
|
Underground for (1) light, and bonding for (4) EQ plane, (1) handrail, (1) grabrail, (1) handicap lift, (1) cage/equipment, Phone #: ###-#### Inspection requested via web by Lars Johnson Underground, bonds at 4 corners, luminaire, 3' west from S.E. corner, 2' north from S.W corner, bottom of steps for rail, top of step for bar, to equipment room in bldg. Rough in ok cover
|