Final | 4/26/2016 | 4/26/2016 | 4/26/2016 | P | PASS |
Rock A. Hudson
|
|
|
Please call Angela half hour prior to going out. Phone #: ###-#### Final ok
|
Electrical Rough-In | 5/18/2015 | 5/19/2015 | 5/19/2015 | A | PASS |
Rock A. Hudson
|
|
|
Angela Phone #: ###-#### Master bath rough-in ok to cover
|
Electrical Rough-In | 5/15/2015 | 5/18/2015 | 5/18/2015 | A | FAIL |
Rock A. Hudson
|
|
|
Angela Phone #: ###-#### 300.4- NM cable shall be protected from physical damage when ran thru bored holes that do not maintain 1 1/4" from framing surface. NM cable shall be secured 1 1/4" from framing surface. BCC- Make up shall be complete. Tie ground thru with pigtails for each device and neutrals in switch boxes.
|
Conference | 5/8/2015 | 5/11/2015 | 5/11/2015 | A | DONE |
Bob Reichert
|
|
|
would like call 30min ahead; Evon Phone #: ###-#### talked about wiring bath upstairs, code items like free length, 1 1/4", circuits, spacing outlets, when to call for inspections
|