Final | 8/31/2015 | 8/31/2015 | 8/31/2015 | P | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Emmet Bushman final ok
|
Final | 8/27/2015 | 8/31/2015 | 8/31/2015 | A | CANC |
Eric Story
|
|
|
Key over front door light Phone #: ###-#### >> Inspection requested via web by Emmet Bushman Inspection cancelled from web by: Emmet Bushman
|
Final | 8/26/2015 | 8/27/2015 | 8/27/2015 | P | CANC |
Eric Story
|
|
|
key is over light at front door Phone #: ###-#### Inspection requested via web by Emmet Bushman cancelled due to hardwood floors being finished
|
Final | 8/25/2015 | 8/27/2015 | 8/26/2015 | A | CANC |
Eric Story
|
|
|
key above front door light Phone #: ###-#### >> Inspection requested via web by Emmet Bushman Inspection cancelled from web by: Emmet Bushman
|
Electrical Rough-In | 7/22/2015 | 7/22/2015 | 7/22/2015 | P | PASS |
Eric Story
|
|
|
Floor heat install After 2:00 if possible Phone #: ###-#### Inspection requested via web by Emmet Bushman rough-in master floor heat ok cover
|
Rough-In Permanent Service | 5/21/2015 | 5/22/2015 | 5/22/2015 | P | PASS |
Rex Boyles
|
|
|
Phone #: ###-#### Inspection requested via web by Emmet Bushman r/i ok house and garage p/s o/h n ok
|
Conference | 5/19/2015 | 5/20/2015 | 5/20/2015 | P | DONE |
Rock A. Hudson
|
|
|
Trench inspection Phone #: ###-#### Inspection requested via web by Emmet Bushman Discussed run from garage underground to house will run above ground part way in rigid conduit then back underground to house.
|
Electrical Rough-In | 5/20/2015 | 5/20/2015 | 5/20/2015 | P | PART |
Rock A. Hudson
|
|
|
Trench inspection Phone #: ###-#### Inspection requested via web by Emmet Bushman Underground portion from garage to house rough in ok cover
|