Final | 6/10/2016 | 6/14/2016 | 6/14/2016 | A | PASS |
Daryl DeGrange
|
|
|
would like call ahead; Biff Phone #: ###-#### final ok
|
Electrical Rough-In | 9/10/2015 | 9/11/2015 | 9/11/2015 | A | PASS |
Daryl DeGrange
|
|
|
Biff Phone #: ###-#### rough-in ok cover pump house
|
Conference | 8/13/2015 | 8/14/2015 | 8/14/2015 | A | DONE |
Daryl DeGrange
|
|
|
Spoke with homeowner, discussed electrical requirement for installing lighting and receptacles in out building.
|
Rough-In Permanent Service | 5/28/2015 | 5/29/2015 | 5/29/2015 | A | PASS |
Daryl DeGrange
|
|
|
First thing, please - Biff Phone #: ###-#### rough-in ok cover trench form service to pump house.
|
Conference | 5/15/2015 | 5/15/2015 | 5/19/2015 | P | DONE |
Daryl DeGrange
|
|
|
Biff Discussed with homeowner elecrtrical requirements for installing 240 volt branch circuit for new well pumb
|