Final | 3/14/2018 | 3/14/2018 | 3/14/2018 | P | PASS |
Rock A. Hudson
|
|
|
James Phone #: ###-#### Final ok
|
Electrical Rough-In | 2/27/2018 | 2/27/2018 | 2/27/2018 | P | PASS |
Rock A. Hudson
|
|
|
James Phone #: ###-#### West offices grid rough in ok cover
|
Electrical Rough-In | 2/20/2018 | 2/20/2018 | 2/20/2018 | P | PASS |
Rock A. Hudson
|
|
|
James-ceiling Phone #: ###-#### Level 1 west offices not ready. Level 1 central offices and conference room grid rough in ok cover.
|
Electrical Rough-In | 7/20/2017 | 7/20/2017 | 7/20/2017 | P | PASS |
Eric Story
|
|
|
James Phone #: ###-#### Remaining wall in office ok cover
|
Electrical Rough-In | 7/11/2017 | 7/11/2017 | 7/11/2017 | P | PASS |
Rock A. Hudson
|
|
|
2nd floor rough in noted on ELE14-03065 which was for demo only. 1 area noted on contractor print not ready. Rest of walls and hardlids rough in ok cover
|