Final | 10/6/2016 | 10/7/2016 | 10/7/2016 | A | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Items as noted ok, Final ok signed inspection record for final
|
Final | 9/29/2016 | 9/30/2016 | 9/30/2016 | A | PART |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Needed to trim out recep desk, WR GFCI's in front planter, Fire caulk penetrations in elec rooms, make handles for the Spare transformer disc on bus duct.
|
Electrical Rough-In | 9/29/2016 | 9/30/2016 | 9/29/2016 | A | CANC |
James Ady
|
|
|
1st Floor Final Phone #: ###-#### >> Inspection requested via web by Kerri Hamilton Inspection cancelled from web by: Kerri Hamilton
|
Electrical Rough-In | 9/23/2016 | 9/26/2016 | 9/26/2016 | A | PASS |
James Ady
|
|
|
1st Floor Recept Desk Phone #: ###-#### Inspection requested via web by Kerri Hamilton Reception desk and west hall adn storage ceiling first floor ok to cover
|
Final | 9/7/2016 | 9/7/2016 | 9/7/2016 | P | CANC |
James Ady
|
|
|
Partial final on Floors 2,3 ; 4 Phone #: ###-#### Inspection requested via web by Kerri Hamilton Needed rough in to move furniture in
|
Electrical Rough-In | 9/7/2016 | 9/7/2016 | 9/7/2016 | P | PASS |
James Ady
|
|
|
Partial final on Floors 2,3 ; 4 Phone #: ###-#### Inspection requested via web by Kerri Hamilton Ok to move in furniture on floors 2,3 and 4 only
|
Electrical Rough-In | 9/6/2016 | 9/6/2016 | 9/6/2016 | P | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Rough-in ok cover first floor ceiling grid areas highlighted blue and dated 9/06/16
|
Electrical Rough-In | 8/15/2016 | 8/16/2016 | 8/16/2016 | A | PASS |
Eric Story
|
|
|
1st Floor Cover Phone #: ###-#### Inspection requested via web by Kerri Hamilton entry vestibule drop ceiling only ok cover
|
Electrical Rough-In | 8/15/2016 | 8/15/2016 | 8/15/2016 | P | PASS |
Bob Reichert
|
|
|
2nd Floor Ceiling cover Phone #: ###-#### Inspection requested via web by Kerri Hamilton clouds ok to cover, saw from 1st floor, west side, about 4 sets
|
Electrical Rough-In | 8/11/2016 | 8/12/2016 | 8/12/2016 | A | NH |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Called contact no answer left message. Must Recall
|
Electrical Rough-In | 8/2/2016 | 8/3/2016 | 8/3/2016 | P | PASS |
James Ady
|
|
|
4th floor ceiling cover. Thanks Phone #: ###-#### Inspection requested via web by Kerri Hamilton Ceiling ok to cover as marked on print
|
Electrical Rough-In | 8/1/2016 | 8/2/2016 | 8/2/2016 | P | PART |
James Ady
|
|
|
4th floor Phone #: ###-#### Inspection requested via web by Kerri Hamilton Ceiling as marked on contractor print ok to cover
|
Electrical Rough-In | 7/29/2016 | 8/1/2016 | 8/1/2016 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Parking lot planter underground rough in ok cover
|
Electrical Rough-In | 7/27/2016 | 7/28/2016 | 7/28/2016 | A | PASS |
Eric Story
|
|
|
Cover 2nd ; 3rd Floor Phone #: ###-#### Inspection requested via web by Kerri Hamilton areas noted on contractors print, suspended ceilings only ok cover
|
Electrical Rough-In | 7/27/2016 | 7/27/2016 | 7/27/2016 | P | PASS |
Eric Story
|
|
|
Cover, 1st floor Ball Room Phone #: ###-#### Inspection requested via web by Kerri Hamilton ballroom columns only ok cover
|
Electrical Rough-In | 7/21/2016 | 7/22/2016 | 7/22/2016 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton 1st floor soffits and bath foyer lids rough in ok cover
|
Electrical Rough-In | 7/14/2016 | 7/15/2016 | 7/15/2016 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Underground in planters in south parking lot rough in ok cover
|
Electrical Rough-In | 7/13/2016 | 7/14/2016 | 7/14/2016 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Living area soffits and columns rough in ok cover
|
Electrical Rough-In | 7/12/2016 | 7/12/2016 | 7/12/2016 | P | PASS |
Eric Story
|
|
|
ug Phone #: ###-#### Inspection requested via web by Kerri Hamilton south entrance area for planters u/g ok cover
|
Electrical Rough-In | 7/7/2016 | 7/8/2016 | 7/8/2016 | A | PASS |
Daryl DeGrange
|
|
|
Underground. 3 raised planters on north side of building Phone #: ###-#### Inspection requested via web by Kerri Hamilton Rough-in ok cover
|
Electrical Rough-In | 6/30/2016 | 6/30/2016 | 6/30/2016 | P | PASS |
James Ady
|
|
|
Ceiling Phone #: ###-#### Inspection requested via web by Kerri Hamilton 1 room 2nd floor 3 rooms 3rd floor, all marked on contractor print. Ceiling Rough in ok to cover
|
Electrical Rough-In | 6/23/2016 | 6/27/2016 | 6/27/2016 | A | PASS |
Rock A. Hudson
|
|
|
Ceiling rough-in for 2nd and 3rd floors Phone #: ###-#### Inspection requested via web by Kerri Hamilton Grid as noted on contractor print in blue rough in ok cover
|
Electrical Rough-In | 6/23/2016 | 6/24/2016 | 6/24/2016 | A | PASS |
Rock A. Hudson
|
|
|
Elevator cover for 2nd, 3rd, and 4th floors Phone #: ###-#### Inspection requested via web by Kerri Hamilton Elevator door wall rough in ok cover as noted
|
Electrical Rough-In | 6/13/2016 | 6/14/2016 | 6/14/2016 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton 1st floor entry soffits and east fireplace wall, 4th floor student desk soffit and bathroom hardlids rough in ok cover
|
Electrical Rough-In | 6/7/2016 | 6/7/2016 | 6/7/2016 | P | PASS |
Rock A. Hudson
|
|
|
Underground Phone #: ###-#### Inspection requested via web by Kerri Hamilton South parking lot east 1/2 underground rough in ok cover
|
Electrical Rough-In | 6/6/2016 | 6/6/2016 | 6/6/2016 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton 4 pole bases north side and east 1 rough in ok cover
|
Electrical Rough-In | 6/3/2016 | 6/3/2016 | 6/3/2016 | P | PASS |
Rock A. Hudson
|
|
|
Cover Phone #: ###-#### Inspection requested via web by Kerri Hamilton Underground south east corner of building and 2nd and 3rd floor conference room soffit cans rough in ok cover
|
Electrical Rough-In | 5/31/2016 | 5/31/2016 | 5/31/2016 | P | PASS |
Rock A. Hudson
|
|
|
Underground Phone #: ###-#### Inspection requested via web by Kerri Hamilton North side from center of building to planter and under sidewalk rough in ok cover.
|
Electrical Rough-In | 5/26/2016 | 5/26/2016 | 5/26/2016 | P | PASS |
James Ady
|
|
|
Underground Phone #: ###-#### Inspection requested via web by Kerri Hamilton SW corner ok to cover
|
Electrical Rough-In | 5/24/2016 | 5/25/2016 | 5/25/2016 | P | PASS |
James Ady
|
|
|
Underground Phone #: ###-#### Inspection requested via web by Kerri Hamilton Underground ok to cover SE corner only
|
Electrical Rough-In | 5/24/2016 | 5/25/2016 | 5/25/2016 | A | PASS |
Rock A. Hudson
|
|
|
Underground Phone #: ###-#### Inspection requested via web by Kerri Hamilton Parking lot underground 2 east trenches and 4 interior pole bases rough in ok cover. Discussed travel areas in parking area ok to cover trenches prior to inspection if photos are taken.
|
Electrical Rough-In | 5/19/2016 | 5/20/2016 | 5/20/2016 | P | PASS |
Rock A. Hudson
|
|
|
Ron Hamilton Phone #: ###-#### Inspection requested via web by Kerri Hamilton Pole bases around south parking lot 8 total rough in ok cover
|
Electrical Rough-In | 5/17/2016 | 5/18/2016 | 5/18/2016 | A | PASS |
Rock A. Hudson
|
|
|
Ron Hamilton Phone #: ###-#### Inspection requested via web by Kerri Hamilton Underground west side of bldg to S.W corner for pole bases rough in ok cover
|
Permanent Service | 5/12/2016 | 5/13/2016 | 5/13/2016 | A | PASS |
Rex Boyles
|
|
|
Ron Hamilton Phone #: ###-#### Inspection requested via web by Kerri Hamilton p/s u/g n ok NOT:already energized (customer owned) Ron will keep everything locked out and doors will be installed on main electrical room and all other electrical rooms throughout project. Will look for waterbond and sprinkeler riser bond at next inspection
|
Electrical Rough-In | 5/12/2016 | 5/13/2016 | 5/13/2016 | A | PASS |
Rex Boyles
|
|
|
Ron Hamilton Phone #: ###-#### Inspection requested via web by Kerri Hamilton r/i ok stairwell 1 hard lid and walls on all floors in stairwell 1
|
Electrical Rough-In | 5/11/2016 | 5/11/2016 | 5/11/2016 | P | PASS |
Rex Boyles
|
|
|
Cover Ron Hamilton Phone #: ###-#### Inspection requested via web by Kerri Hamilton r/i ok 4 north interior columns
|
Electrical Rough-In | 4/25/2016 | 4/26/2016 | 4/26/2016 | A | PASS |
Rex Boyles
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton r/i ok 2 ballroom columns, 2nd floor bathrooms ceilings,, 3rd floor womens bathroom ceiling
|
Conference | 4/1/2016 | 4/4/2016 | 4/4/2016 | P | DONE |
Rex Boyles
|
|
|
Ron Hamilton Phone #: ###-#### Inspection requested via web by Kerri Hamilton discuss data backboard install above xformer on each floor. OK to do this
|
Electrical Rough-In | 3/23/2016 | 3/24/2016 | 3/24/2016 | A | PASS |
Rex Boyles
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton r/i ok entire north exterior wall (living rm. wall)
|
Electrical Rough-In | 3/17/2016 | 3/18/2016 | 3/18/2016 | A | PASS |
Rex Boyles
|
|
|
1st Floor Exterior Soffit Phone #: ###-#### Inspection requested via web by Kerri Hamilton r/i ok all soffit recessed lights except front area
|
Electrical Rough-In | 2/26/2016 | 2/29/2016 | 2/29/2016 | A | PASS |
Rex Boyles
|
|
|
Cover inspection for 1st Floor Phone #: ###-#### Inspection requested via web by Kerri Hamilton r/i ok walls on 1st floor BUT NO SOFFITS, r/i ok walls 4th floor
|
Electrical Rough-In | 2/8/2016 | 2/8/2016 | 2/8/2016 | P | PASS |
Rex Boyles
|
|
|
Ron Hamilton Phone #: ###-#### Inspection requested via web by Kerri Hamilton r/i all walls ok on 2nd and 3rd floors
|
Conference | 1/5/2016 | 1/6/2016 | 1/6/2016 | A | DONE |
Rex Boyles
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton walk thru and look at HVAC air handeler VAV units for clearance issues. After walk thru clearances look ok. No problems at this time.
|
Electrical Rough-In | 1/5/2016 | 1/6/2016 | 1/6/2016 | A | PASS |
Rex Boyles
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton r/i walls in electrical, mechanical and data rooms as per notes on sheets E2.1P, E2.2P and E2.3P
|
Conference | 11/16/2015 | 11/17/2015 | 11/17/2015 | A | DONE |
Daryl DeGrange
|
|
|
Ron Hamilton Phone #: ###-#### Inspection requested via web by Kerri Hamilton NEC 110.26(C) Discuss adequate accessibility to service gear install parapet wall for rooftop units.
|
Electrical Rough-In | 10/13/2015 | 10/14/2015 | 10/14/2015 | A | PASS |
Rex Boyles
|
|
|
Marcelo Leon Phone #: ###-#### Inspection requested via web by Kerri Hamilton 4 front columns r/i ok
|
Conference | 8/24/2015 | 8/25/2015 | 8/25/2015 | A | DONE |
Rex Boyles
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton discuss clearances for electrical panels in air handelers as per 110.26(A)(1). Need 3' 6" for the 277 voltage in front of units and approx. 30" wide clearance. Exceptions for side panels to replace filters and blower motors where limited.
|
Electrical Rough-In | 7/17/2015 | 7/20/2015 | 7/20/2015 | A | PASS |
Daryl DeGrange
|
|
|
Ron Hamilton Phone #: ###-#### Inspection requested via web by Kerri Hamilton Rough-in ok cover underground, N.W area or Ballroom
|
Electrical Rough-In | 7/15/2015 | 7/16/2015 | 7/16/2015 | A | PASS |
Rex Boyles
|
|
|
Ron Phone #: ###-#### Inspection requested via web by Kerri Hamilton r/i ok underslab conduits from main electric rm. to the east electric rm.
|
Electrical Rough-In | 7/8/2015 | 7/9/2015 | 7/9/2015 | P | PASS |
Rex Boyles
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton r/i under slab conduits from 6 line to the east ok . Also underground conduits from front of bldg. to columns ok
|
Electrical Rough-In | 7/1/2015 | 7/2/2015 | 7/2/2015 | A | PASS |
Rex Boyles
|
|
|
Ron Hamilton Phone #: ###-#### Inspection requested via web by Kerri Hamilton r/i ok remainder of telco underground
|
Electrical Rough-In | 6/22/2015 | 6/23/2015 | 6/23/2015 | A | PASS |
Rex Boyles
|
|
|
Ron Hamilton Phone #: ###-#### Inspection requested via web by Kerri Hamilton grounding electrode ok and 4-front column stub outs ok
|
Electrical Rough-In | 6/16/2015 | 6/16/2015 | 6/16/2015 | P | PASS |
Daryl DeGrange
|
|
|
Ron Hamilton Phone #: ###-#### Inspection requested via web by Kerri Hamilton Rough-in ok cover underground service feeders to location of stub-ups
|
Electrical Rough-In | 6/4/2015 | 6/5/2015 | 6/5/2015 | A | PASS |
Rex Boyles
|
|
|
Ron Hamilton Phone #: ###-#### Inspection requested via web by Kerri Hamilton xformer pad to electric rm. u. ground ok. Discuss routing of fire pump conduit engineered incorrectly on single line diagram.
|
Electrical Rough-In | 6/3/2015 | 6/4/2015 | 6/4/2015 | A | PASS |
Rex Boyles
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton continue primarys to xformer pad ok
|
Electrical Rough-In | 6/2/2015 | 6/2/2015 | 6/3/2015 | P | PASS |
Rex Boyles
|
|
|
Underground Phone #: ###-#### Inspection requested via web by Kerri Hamilton u. ground 12.500 volt primary and fiber optic conduits ok to cover across Grant street
|