Final | 8/7/2015 | 8/7/2015 | 8/7/2015 | A | PASS |
Rock A. Hudson
|
|
|
Final the new service. Phone #: ###-#### Inspection requested via web by nathan palmer Final ok
|
Rough-In Permanent Service | 6/5/2015 | 6/5/2015 | 6/5/2015 | A | PASS |
Rock A. Hudson
|
|
|
Please inspect the new electrical service on the back side of the house. I did not bond the water pipe yet. Do I need to? In the back yard you can see the poly pipe coming to the shut-off valve above the ground, then it is rigid metal back under ground. 2 new ground Rods: behind AC ; in the corner by the step next to wood boards in front of the bottom step 6'' apart. AC is in process of getting estimates to shift it over the 1'' foot needed. It was spun to clear the new service to pass a rough-in inspection. Someone will be home until 2p, then approx. 4-6p. There is a dog at home, hopefully inside the house. Phone #: ###-#### Inspection requested via web by nathan palmer Service change rough in ok. On Final check metal water pipe grounding electode bond and jumper at water heater. Informed contractor mast height to high for Idaho Power reconnect. p/s o/h rec ok
|