Final | 8/5/2015 | 8/6/2015 | 8/6/2015 | A | PASS |
Rock A. Hudson
|
|
|
Please get with Max and provide a final inspection. Thanks, Sean Phone #: ###-#### Inspection requested via web by Kevin Perez Final ok
|
Permanent Service | 7/6/2015 | 7/7/2015 | 7/7/2015 | A | PASS |
Eric Story
|
|
|
Max Phone #: ###-#### p/s u/g n ok two 3 phase meters
|
Electrical Rough-In | 7/2/2015 | 7/6/2015 | 7/6/2015 | A | PASS |
Rock A. Hudson
|
|
|
Max Phone #: ###-#### Walls and hardlids rough in ok cover
|
Electrical Rough-In | 6/16/2015 | 6/17/2015 | 6/17/2015 | A | PASS |
Rock A. Hudson
|
|
|
Ron-ceiling Phone #: ###-#### Upper lid at truss bottom rough in ok cover
|
Electrical Rough-In | 6/8/2015 | 6/9/2015 | 6/9/2015 | A | PASS |
Rock A. Hudson
|
|
|
Max Phone #: ###-#### Underslab rough in ok cover
|