Final | 7/10/2015 | 7/16/2015 | 7/16/2015 | P | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Louis Keller final ok
|
Permanent Service | 6/15/2015 | 6/22/2015 | 6/22/2015 | P | CANC |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Louis Keller needed rough-in and perm service inspect
|
Rough-In Permanent Service | 6/22/2015 | 6/22/2015 | 6/22/2015 | P | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Louis Keller rough-in u/g to hot tub ok cover verify conduit and light to be removed and water pipe bond p/s o/h n recc ok
|