Final | 8/14/2015 | 8/14/2015 | 8/14/2015 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by daniel bibikov Final ok
|
Permanent Service | 6/24/2015 | 7/1/2015 | 7/1/2015 | A | CANC |
Bob Reichert
|
|
|
Phone #: ###-#### Inspection requested via web by daniel bibikov called, said done by 445 6/25 per notes
|
Permanent Service | 6/24/2015 | 6/25/2015 | 6/25/2015 | A | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### Inspection requested via web by daniel bibikov p/s u/g n ok 4 plex
|
Electrical Rough-In | 6/16/2015 | 6/16/2015 | 6/16/2015 | A | PASS |
Rock A. Hudson
|
|
|
Call Daniel if you have any questions. Thank you ###-#### Phone #: ###-#### Inspection requested via web by daniel bibikov Rough in ok cover
|
Electrical Rough-In | 6/15/2015 | 6/15/2015 | 6/15/2015 | P | FAIL |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by daniel 300.4 bored holes wire must mantain 1 1/4 from nearest edge 314.7 (c) not less then 1/4in of sheathing inside box or clamp 300.3 cables installed parrellel with framing must have 1 1/4 min from edge of framing member
|