Final | 8/3/2015 | 8/4/2015 | 8/4/2015 | A | PASS |
Eric Story
|
|
|
Please Call Contractor Brian From Mirage Pools ONE hour before arriving, at ###-####. Thank you! Phone #: ###-#### Inspection requested via web by Louis Keller final ok
|
Final | 7/15/2015 | 7/16/2015 | 7/16/2015 | P | FAIL |
Eric Story
|
|
|
Please call contractor Brian from Mirage Pool at ###-#### 1 1/2 hours before arriving at property as he is coming from Parma, ID. Thank you!! Phone #: ###-#### Inspection requested via web by Louis Keller 110.26 must maintain 36" from energized parts for servicing&adjustment of time clock
|
Final | 7/8/2015 | 7/9/2015 | 7/9/2015 | A | CANC |
Eric Story
|
|
|
Please call Brian Metheny with Mirage Pools before heading to sight. ###-#### Phone #: ###-#### Inspection requested via web by Louis Keller contractor could not make it
|
Electrical Rough-In | 6/17/2015 | 6/18/2015 | 6/18/2015 | A | PASS |
Eric Story
|
|
|
Potting ; Bonding Phone #: ###-#### Inspection requested via web by Louis Keller rough-in bonding luminares in pool cover ok
|