Final | 9/3/2015 | 9/4/2015 | 9/4/2015 | A | PASS |
Eric Story
|
|
|
Chris is the contact his cell no. is ###-#### Phone #: ###-#### Inspection requested via web by Shawna Gates final ok
|
Electrical Rough-In | 8/3/2015 | 8/4/2015 | 8/4/2015 | P | PASS |
Eric Story
|
|
|
Ceiling/cover. Rob is the contact his cell no. is ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates cieling ok cover verify with rob on final to see final fixtures in ceiling
|
Electrical Rough-In | 6/25/2015 | 6/26/2015 | 6/26/2015 | P | PASS |
Eric Story
|
|
|
wall inspection. Rob is the contact his cell no. is ###-#### Phone #: ###-#### Inspection requested via web by Shawna Gates rough-in walls ok cover
|
Final | 6/25/2015 | 6/26/2015 | 6/25/2015 | P | CANC |
Eric Story
|
|
|
Wall cover inspection. Rob is the contact his cell no. is ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates
|