Final | 7/28/2015 | 7/29/2015 | 7/29/2015 | A | PASS |
Rock A. Hudson
|
|
|
Final at Starbucks remodel. Contact is Jay Sprik. Phone #: ###-#### Inspection requested via web by Richard Montgomery No card posted. Final ok
|
Final | 7/28/2015 | 7/28/2015 | 7/28/2015 | P | NR |
Rock A. Hudson
|
|
|
Final at Starbucks remodel. Contact is Jay Sprik. Phone #: ###-#### Inspection requested via web by Richard Montgomery Contractor called and said he would not be ready by PM. Will reschedule
|
Electrical Rough-In | 7/16/2015 | 7/17/2015 | 7/17/2015 | P | PASS |
Rock A. Hudson
|
|
|
Rough-in of walls. Contact is Jay Sprik. Phone #: ###-#### Inspection requested via web by Richard Montgomery Wall rough in ok cover
|
Conference | 7/7/2015 | 7/7/2015 | 7/7/2015 | P | DONE |
Rock A. Hudson
|
|
|
This is a conference to meet at the Starbucks jobsite at Boise Town Square Mall to discuss the proximity of the new sink to the existing electrical panels. Please contact Jay Sprik, ###-####, to determine what time to meet. Phone #: ###-#### Inspection requested via web by Richard Montgomery Discussed minimum distance from a panel to a sink. Boise City Ordinance Section 4-05 31-SPECIAL CODE REQUIREMENTS In addition to the provisions specified in this Section, the Director of the Planning & Development Services Department may require other safeguards based on special conditions that may be present in a particular installation. These safeguards include but are not limited to the following: A. Disconnect and Panel Locations. Main Circuit disconnecting switches and/or distribution panels shall not be installed in a bathroom, shower room, toilet room or next to a washbasin, laundry tub, janitor's tub or other location thought unsafe by the inspector. Minimum distance of 3' waters edge to bussing.
|