Final | 8/21/2015 | 8/21/2015 | 8/21/2015 | P | PASS |
Daryl DeGrange
|
|
|
Shell, service and site lighting final ok
|
Final | 8/13/2015 | 8/14/2015 | 8/14/2015 | P | PART |
Rex Boyles
|
|
|
Phone #: ###-#### Inspection requested via web by Jon Novak needed temp. occupancy. did walk thru inspection with Jon and he will be installing some GFCI receptacles in various rooms. Still need to look at hanger area and outside. Will do final inspection at next inspection.
|
Electrical Rough-In | 6/30/2015 | 7/1/2015 | 7/1/2015 | A | PASS |
Rex Boyles
|
|
|
Jon Phone #: ###-#### r/i 4 south light pole bases ok
|
Permanent Service | 5/26/2015 | 5/27/2015 | 5/27/2015 | A | PASS |
Rex Boyles
|
|
|
Contact Jon Novak Phone #: ###-#### Inspection requested via web by Cathy Duchek performance testing done as per 230.95 p/s u/g n ok
|
Electrical Rough-In | 4/30/2015 | 5/1/2015 | 5/1/2015 | A | PASS |
Rex Boyles
|
|
|
Under ground Inspection for SkyWest. Contact Shawn Evins Phone #: ###-#### Inspection requested via web by Cathy Duchek r/i u.ground ok for fire tank doghouse and n.east light pole
|
Electrical Rough-In | 4/13/2015 | 4/14/2015 | 4/14/2015 | A | PASS |
Rex Boyles
|
|
|
Ceiling Inspection at SkyWest, Contact Shawn Evins. Phone #: ###-#### Inspection requested via web by Cathy Duchek this is an under ground inspection west apron light poles ok to cover
|
Electrical Rough-In | 4/1/2015 | 4/2/2015 | 4/2/2015 | A | PASS |
Rex Boyles
|
|
|
Underground Inspection at SkyWest Contact Shawn Evins Phone #: ###-#### Inspection requested via web by Cathy Duchek hanger u.ground telco and H1 and H2 ok to cover. Remainder of interior office walls ok to cover.
|
Electrical Rough-In | 2/12/2015 | 2/13/2015 | 2/13/2015 | A | PASS |
Rex Boyles
|
|
|
Underground Inspection. Contact Shawn Evins Phone #: ###-#### Inspection requested via web by Tom Betty r/i underslab continuation of feeders into hanger area ok see E.2A sheets
|
Electrical Rough-In | 2/4/2015 | 2/5/2015 | 2/5/2015 | A | PASS |
Rex Boyles
|
|
|
Underground Inspection. Contact Shawn Evins Phone #: ###-#### Inspection requested via web by Tom Betty underslab conduits to fire pump rm partial r/i ok
|
Electrical Rough-In | 12/2/2014 | 12/3/2014 | 12/3/2014 | A | PASS |
Rex Boyles
|
|
|
Sleeve Inspection on the East side of the SkyWest footing. Contact Shawn Evins at ###-#### Phone #: ###-#### Inspection requested via web by Tom Betty r/i sleeves ok
|
Electrical Rough-In | 11/24/2014 | 11/24/2014 | 11/24/2014 | A | PASS |
Rex Boyles
|
|
|
Underground from IP transformer to building and for sleeving thru footings, Contact Shawn Evins at ###-#### Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok secondaries and telco and west wall sleeves
|
Electrical Rough-In | 10/30/2014 | 10/30/2014 | 10/31/2014 | A | PASS |
Rex Boyles
|
|
|
Contact Shawn Evins Phone #: ###-#### Inspection requested via web by Tom Betty grounding electrode conductor and sleeves ok
|