Final | 2/2/2016 | 2/4/2016 | 2/4/2016 | P | PASS |
Bob Reichert
|
|
|
Final inspection for bldg. 16 DEG remodel. Phone #: ###-#### Inspection requested via web by Ron Pontius ok final
|
Final | 2/2/2016 | 2/5/2016 | 2/2/2016 | P | CANC |
Bob Reichert
|
|
|
Final Inspection for bldg. 16 DEG Remodel. Phone #: ###-#### >> Inspection requested via web by Ron Pontius Inspection cancelled from web by: Ron Pontius
|
Electrical Rough-In | 1/21/2016 | 1/27/2016 | 1/27/2016 | A | PASS |
Bob Reichert
|
|
|
Please contact Ron Pontius at ###-####. Ceiling inspection so tiles can be installed. Phone #: ###-#### Inspection requested via web by Steve Moss ok cover ceiling
|
Electrical Rough-In | 12/15/2015 | 12/16/2015 | 12/16/2015 | A | PASS |
Bob Reichert
|
|
|
Rough-in wall inspection so the sheet rock can be installed. Phone #: ###-#### Inspection requested via web by Steve Moss ok cover walls
|
Electrical Rough-In | 9/22/2015 | 9/23/2015 | 9/23/2015 | A | PASS |
Bob Reichert
|
|
|
need ceiling inspection before tiles are installed. Phone #: ###-#### Inspection requested via web by Steve Moss ok cover ceiling
|