Final | 7/22/2015 | 7/22/2015 | 7/22/2015 | P | PASS |
Rock A. Hudson
|
|
|
The issue with the parallel path has been corrected. Phone #: ###-#### Inspection requested via web by Dave Koeppen Generator to be set in future. Final ok
|
Permanent Service | 7/16/2015 | 7/17/2015 | 7/17/2015 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Dave Koeppen Bonding of grounded conductor takes place in gutter, Additional bonding point shall be removed. p/s u/g rec ok
|