Final | 7/31/2015 | 8/3/2015 | 8/3/2015 | A | PASS |
Rex Boyles
|
|
|
Phone #: ###-#### Inspection requested via web by Shawna Gates final ok
|
Permanent Service | 8/3/2015 | 8/3/2015 | 8/3/2015 | P | PASS |
Rex Boyles
|
|
|
Phone #: ###-#### Inspection requested via web by Shawna Gates corrections made p/s u/g rec ok
|
Final | 7/28/2015 | 7/29/2015 | 7/29/2015 | P | FAIL |
Daryl DeGrange
|
|
|
Kevin with Penske is the contact his cell no. is ###-#### or Chris with Doherty Electric ###-####. Phone #: ###-#### Inspection requested via web by Shawna Gates NEC 110.24 shall post available AFC and date posted, NEC 250.53(G) Grounding electrode shall be installed at least 8ft. in contact with the soil. NEC 250.56 permanent services requires two ground rods unless 25 ohms or less of resistance
|