Final | 8/10/2015 | 8/10/2015 | 8/10/2015 | P | PASS |
Rex Boyles
|
|
|
Phone #: ###-#### Inspection requested via web by Cindie Swaim corrections made final ok
|
Final | 8/7/2015 | 8/10/2015 | 8/10/2015 | A | NH |
Rex Boyles
|
|
|
Phone #: ###-#### Inspection requested via web by Cindie Swaim no access to panel inside
|
Rough-In Permanent Service | 8/6/2015 | 8/6/2015 | 8/6/2015 | P | PASS |
Rex Boyles
|
|
|
IPCO on 3-4 day wait time. Dig line on Friday. Phone #: ###-#### Inspection requested via web by Cindie Swaim r/i ok p/s o/h rec ok NOTES: Must maintain 18 foot to service drop conductors, will look for fault current amount at final, will look for second ground rod at final. Additional work not associated with service will need separate permit.
|
Final | 8/4/2015 | 8/5/2015 | 8/5/2015 | A | FAIL |
Rex Boyles
|
|
|
Inspection requested via web by Cindie Swaim 110.16- arc flash hazard warning label required on loadcenters. 110.24- service equipment in other than dwellings shall be legibly marked in the field with the maximum available fault current including date of calculation and be of suffiecient durability. ( from Idaho Power). 250 53(D)(2)- supplemental ground rod required. 250.94-intersystem bond termiation required. 250.104(A)- Bond water pipes or sections where required. Also need to call for "permanent service " when ready, then final. No phone number or contact to call
|