Final | 1/25/2016 | 1/26/2016 | 1/26/2016 | A | PASS |
Rock A. Hudson
|
|
|
Alan Phone #: ###-#### Final ok
|
Electrical Rough-In | 1/19/2016 | 1/19/2016 | 1/19/2016 | P | PASS |
Rex Boyles
|
|
|
Alan Phone #: ###-#### r/i ok will finish making up ground wires and landing grounds and nuetrals in sub panel , then call for final after trim is complete.
|
Electrical Rough-In | 9/14/2015 | 9/14/2015 | 9/14/2015 | P | PASS |
Rock A. Hudson
|
|
|
underground; Alan Phone #: ###-#### Underground to green house rough in ok cover
|
Conference | 8/4/2015 | 8/5/2015 | 8/5/2015 | A | DONE |
Rock A. Hudson
|
|
|
Alan Phone #: ###-#### Discussed minimum size service to detached green house, only planning 2 circuits neede but want option for future so 60 amp needed. Depth of underground, number of bends between pull points, size of conductor for service, GFCI protection, tamper resistant receptacles and cover needed for wet location.
|