Final | 5/16/2016 | 5/16/2016 | 5/16/2016 | P | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Spencer McLean correction fixed final ok
|
Final | 4/26/2016 | 4/27/2016 | 4/27/2016 | A | FAIL |
Eric Story
|
|
|
Please inspect for final on permit Phone #: ###-#### Inspection requested via web by Spencer McLean need blank on box with cut m/c inside
|
Electrical Rough-In | 3/16/2016 | 3/17/2016 | 3/17/2016 | A | PASS |
Rock A. Hudson
|
|
|
Rough in inspection Phone #: ###-#### Inspection requested via web by Spencer McLean 3 Massage or therapy rooms rough in ok cover
|
Electrical Rough-In | 1/29/2016 | 1/29/2016 | 1/29/2016 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Spencer McLean Grid in reception area rough in ok cover
|
Electrical Rough-In | 11/27/2015 | 11/30/2015 | 11/30/2015 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Spencer McLean Reception area and 1 exam room south end of office wall rough in ok cover
|
Electrical Rough-In | 11/12/2015 | 11/12/2015 | 11/12/2015 | P | PASS |
Rock A. Hudson
|
|
|
Please inspect the ceiling for cover. Phone #: ###-#### Inspection requested via web by Spencer McLean Area 2.3 grid rough in ok cover
|
Electrical Rough-In | 9/16/2015 | 9/16/2015 | 9/16/2015 | P | PASS |
Rock A. Hudson
|
|
|
###-#### Jeff. Wall rough in in back area and partial final west section. Private office, massage rm, pc pt 1&2 as noted on contractor print wall rough in ok cover
|
Electrical Rough-In | 9/15/2015 | 9/16/2015 | 9/16/2015 | A | PASS |
Rock A. Hudson
|
|
|
Partial rough in and final Phone #: ###-#### Inspection requested via web by Spencer McLean Grid rough in ok cover
|
Final | 9/16/2015 | 9/16/2015 | 9/16/2015 | P | CANC |
Rock A. Hudson
|
|
|
Partial rough in and final Phone #: ###-#### Inspection requested via web by Spencer McLean No card posted. Final ok
|
Electrical Rough-In | 8/12/2015 | 8/13/2015 | 8/13/2015 | A | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Spencer McLean IJS rooms 1-2-3 walls ok cover
|
Electrical Rough-In | 8/11/2015 | 8/11/2015 | 8/11/2015 | A | PASS |
Daryl DeGrange
|
|
|
rough-in ok cover reception area walls
|
Electrical Rough-In | 8/10/2015 | 8/10/2015 | 8/10/2015 | P | FAIL |
Daryl DeGrange
|
|
|
Cover inspection Phone #: ###-#### Inspection requested via web by Spencer McLean NEC 300.4 ENT installed for low voltage wiring shall be protected from phyical damage
|