Final | 9/23/2015 | 9/24/2015 | 9/24/2015 | A | PASS |
Rock A. Hudson
|
|
|
Should all be ready and the side door should be open thanks Phone #: ###-#### Inspection requested via web by Brad Baker Final ok
|
Final | 9/23/2015 | 9/23/2015 | 9/23/2015 | P | FAIL |
Rock A. Hudson
|
|
|
The side garage door is unlocked for inspections Phone #: ###-#### Inspection requested via web by Brad Baker 210.8(A)(6)- All receptacles located in kitchen that serve counter top area shall have GFCI protection. 422.30- All appliances shall have a disconnecting means.
|
Electrical Rough-In | 8/12/2015 | 8/13/2015 | 8/13/2015 | A | PASS |
Daryl DeGrange
|
|
|
Call for access Phone #: ###-#### Inspection requested via web by Brad Baker rough-in ok cover kitchen,dinning remodel
|