Final | 8/20/2015 | 8/20/2015 | 8/20/2015 | P | PASS |
Bob Reichert
|
|
|
Call me 40 min in advance so i can be there with the spec sheets and job prints. I''m running around town so 40 min should be enough time. Phone #: ###-#### Inspection requested via web by Thaniel Bishop ok final
|
Electrical Rough-In | 8/18/2015 | 8/18/2015 | 8/18/2015 | P | PASS |
Bob Reichert
|
|
|
I wont be there in the morning. It is a PV array. Panels are arriving today and the rest is done. Later in the afternoon the job will be finished. Phone #: ###-#### Inspection requested via web by George Stanton ri ok
|