Final | 8/25/2015 | 8/26/2015 | 8/26/2015 | A | PASS |
Eric Story
|
|
|
Need final inspection for hot tub. Phone #: ###-#### Inspection requested via web by Alan Lusk hot tub final ok
|
Electrical Rough-In | 8/15/2015 | 8/17/2015 | 8/17/2015 | A | PASS |
Eric Story
|
|
|
Need tench inspection for hot tub wiring. Phone #: ###-#### Inspection requested via web by Alan Lusk underground for hot tub ok cover
|
Electrical Rough-In | 8/14/2015 | 8/14/2015 | 8/14/2015 | P | CANC |
Eric Story
|
|
|
need inspection to cover conduit for hot tub. Phone #: ###-#### Inspection requested via web by Alan Lusk not ready
|