Final | 1/8/2016 | 1/8/2016 | 1/8/2016 | P | PASS |
Eric Story
|
|
|
Mitch Phone #: ###-#### final ok
|
Electrical Rough-In | 10/21/2015 | 10/22/2015 | 10/22/2015 | A | PASS |
Eric Story
|
|
|
Mitch Phone #: ###-#### unit 1140 rough-in ok cover
|
Permanent Service | 10/6/2015 | 10/6/2015 | 10/6/2015 | P | PASS |
Eric Story
|
|
|
Mitch Phone #: ###-#### p/s u/g rec ok
|
Conference | 8/28/2015 | 8/31/2015 | 8/31/2015 | A | DONE |
Rex Boyles
|
|
|
Mitch Phone #: ###-####The entire electrical system shall be inspected and or tested by an electrical contractor after being compramised by utility line falling onto building. All damaged wiring, devices, light fixtures and electrical service shall be replaced and have an electrical rough in inspection prior to covering.
|