Final | 9/15/2015 | 9/15/2015 | 9/15/2015 | P | PASS |
Rex Boyles
|
|
|
John. Phone #: ###-#### Inspection requested via web by Sean DeLacy corrections made final ok
|
Final | 9/11/2015 | 9/14/2015 | 9/14/2015 | P | FAIL |
Rex Boyles
|
|
|
John. Phone #: ###-#### Inspection requested via web by Sean DeLacy 250.32-buildings supplied by feeder shall have a grounding electrode installed. also see 250.50. 250.94-intersystem bonding busbar required for other systems at the disconnecting means for any buildings or structures. 550.16-install #8 bonding jumper between the 2 frames of modular unit. 110.16- arc flash warning label on loadcenter. NOTE:please provide access to main switchboard for final insp.
|
Electrical Rough-In | 8/20/2015 | 8/21/2015 | 8/21/2015 | A | PASS |
Daryl DeGrange
|
|
|
Sean. Underground cover inspection to portable on NW corner of property. Phone #: ###-#### Inspection requested via web by Sean DeLacy rough-in ok cover underground power and data conduits
|